Colorado Time Systems VP-1 vacuum pump
From Libre Aquatics Wiki, the free aquatics reference
The VP-1 is a hand vacuum pump with a hollow needle, sold by Colorado Time Systems (CTS) for adjusting the air sealed inside a CTS touchpad. It is a plunger pump worked by a T-handle. The pump draws air out of a pad that does not register a touch, and the needle on its own lets air into a pad that signals without being touched.1 Its instruction sheet is F207 Rev.1102, and CTS’s test meter sheet of February 2005 gives the part number VP-1.12 By August 2006 CTS had documented a different pump, the VP-2, and CTS’s 2008 catalogue lists only that pump.34
Role in the timing system¶
This section places the pump among CTS’s touchpad maintenance tools.
The amount of air sealed in a CTS touchpad decides how hard a swimmer has to press it; the touchpads overview covers that background. The 2005 edition of CTS’s touchpad manual lists two maintenance aids that the company sells: a touchpad test meter, and a vacuum pump with a needle.5 The pump it shows is the VP-1. During any adjustment the pad is plugged into the TPM-D test meter, and the needle is kept in a receptacle on top of that meter between uses.1
The same manual expects pads to need adjusting at installation, and says that pads adjusted then should not need it again.5
Design and construction¶
This section describes the pump as CTS’s 2002 sheet and 2005 manual show it.
The VP-1 is a long cylindrical pump. A rod runs out of one end of the barrel to a black T-handle, and two clear plastic hoses leave the other end.1 The operator holds the barrel in one hand and works the handle in and out with the other, in full, even strokes.1 An arrow is moulded into the end of the pump. The hose on the port below that arrow is the vacuum side, and the pump is held with the arrow pointing up while it is used.1 The photograph in CTS’s sheet shows the needle on the end of one hose.1
An oil hole sits on top of the pump, and CTS recommends a few drops there so that the plunger moves smoothly.1 Neither the sheet nor the manual names the pump’s maker, and no brand can be read in their photographs.15
Adding and releasing air¶
This section covers the two adjustments the needle and pump are used for.
Both adjustments are made with the pad out of the water and its plug in the test meter. The orange rubber plug in the pad’s connector block, which the needle goes through, must be dry, and the cable end of the pad must not be splashed while the needle is in. Water that gets into a pad destroys it.1 CTS also warns never to lift a pad by its cable. A rough needle tip is cleaned up first by rolling it while drawing it over stone or concrete.1
A shorted pad, one that keeps signalling the timer, has too little air. To vent it, the operator inserts the bare needle, with no pump attached, into the middle of the orange plug, seating it fully without force. Once the meter’s red lamps go out, the needle stays in for three more seconds and is then withdrawn.1
An open pad, one that does not signal when touched with a fingertip, has too much air. To evacuate it, the operator fits the needle to the hose on the pump’s vacuum side, pushes it into the plug, and pumps until every lamp on the meter is lit, which shows that the pad’s switch has closed. The operator then stops, waits until the lamps start to go out, counts five seconds and pulls the needle. It goes back in its receptacle on the meter afterwards.1
The sources disagree on the direction in which the lamps travel. The VP-1 sheet and the pump chapter of the 2005 manual say right to left.15 The in-water check in the same manual says the meter fills left to right, which matches the meter’s printed volt scale.52
Diagnosis¶
This section covers how the 2005 manual decides which adjustment a pad needs.
The manual’s troubleshooting table reads the meter together with how the pad feels. A firm pad that lights the whole bar when touched and stays dark otherwise is correct. A spongy pad that reads the same way has too much air, and is evacuated only if it floats or loses sensitivity. A firm pad that lights the bar without being touched has too little air and is vented.5 When an evacuation fails to cure an open pad, the table points to venting skipped after the evacuation, the pump hose fitted to the wrong inlet, water in the vacuum hose, or a broken wire in the pad’s cable.5 For a pad that shorts in the middle of a meet, the manual allows the plug to be dried with a towel and the needle left in it for ten seconds. CTS warns that this can damage the pad and that the pad should be checked properly after the meet.5
Compared with the VP-2¶
This section sets out how the VP-1 differs from the pump CTS documented after it.
The VP-2 is a pistol-grip pump squeezed with one hand, where the VP-1 is pushed and pulled with two.13 The VP-1 selects vacuum by which hose is used. The 2006 VP-2 does the same with a front and a top port, and the 2009 VP-2 has a vacuum/pressure switch instead.136 The VP-2 sheets also have the operator cap the needle between steps, which the VP-1 sheet does not mention. The steps at the pad are the same for both pumps.16
CTS’s test meter sheet and touchpad manual of February 2005 still describe the VP-1.25 The first VP-2 sheet is dated August 2006, and the 2008 catalogue lists only the VP-2.34 The 2014 edition of the touchpad manual carries the VP-2 procedure in the chapter that held the VP-1 procedure in 2005.75 No CTS document says the VP-2 replaced the VP-1; that is inferred from these dates.
Documentation¶
This section lists where CTS has published the VP-1 instructions.
| Document | Date | Notes |
|---|---|---|
| F207 Rev.1102, Using Your Needle/Vacuum Pump | November 2002 | The VP-1 sheet1 |
| F147 Rev.0205, Touchpad Manual | February 2005 | Same procedure and figures as chapter 75 |
| F696 Rev.0205, Test Meter Instructions | February 2005 | Names the part number VP-12 |
The same F207 file was on CTS’s website by March 2006 and is still hosted as of 2026.1
Specifications¶
| Manufacturer | Colorado Time Systems, Loveland, Colorado1 |
| Operation | Two-hand plunger pump with T-handle1 |
| Mode selection | Choice of hose; vacuum hose on the port below the moulded arrow1 |
| Connection to the pad | Needle through the orange plug on the connector block, via clear hose1 |
| Maintenance | Oil, a few drops, through the hole on top1 |
| Used with | TPM-D test meter12 |
Part numbers and accessories¶
This section lists the parts the sources name with the pump.
VP-1, the vacuum pump.2TPM-D, the test meter used with it, which holds the needle.1VP-2, the later squeeze-handle pump.6
See also¶
- VP-2 vacuum pump: the later pump
- TPM-D test meter: the meter used during adjustment
- Standard touchpad: the pad it adjusts
- Touchpads: the touchpads overview
- Colorado Time Systems: the manufacturer
- Equipment: the equipment reference
References¶
Footnotes¶
-
Colorado Time Systems, Using Your Needle/Vacuum Pump (F207 Rev.1102), VP-1. ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21 ↩22 ↩23 ↩24 ↩25 ↩26
-
Colorado Time Systems, Test Meter Instructions (F696 Rev. 0205). ↩ ↩2 ↩3 ↩4 ↩5 ↩6
-
Colorado Time Systems, Using Your Needle/Vacuum Pump (F908 Rev.0806). ↩ ↩2 ↩3 ↩4
-
Colorado Time Systems, Making Time Count (2008 catalogue), touchpad accessories. ↩ ↩2
-
Colorado Time Systems, Touchpad Manual (F147 Rev.0205) (2005). ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11
-
Colorado Time Systems, Using Your Needle/Vacuum Pump (F908 Rev.200909). ↩ ↩2 ↩3
-
Colorado Time Systems, Touchpads User Guide (F147, Rev. 201407, July 2014). ↩
Last updated October 22, 2026.